Four Laning of Thalassery-Mahe Bypass section of NH-17 from km 170.600 (design chainage 170.600) to km 188.000 (design chainage 189.200) in the state of Kerala under NHDP Phase – III on EPC mode.
Project Length: 18.6
Authority: NHAI
Construction of ROB including one minor Bridge and approaches with retaining wall at Km.8.674 near Khapri (Nagpur) on NH-7 (NH-44) in the State of Maharashtra
Project Length: 1.5
Authority: NHAI
Four Laning of Hubli - Hospet -Karnataka/AP Border (Design Ch.128+850 to Ch.272+571) Section of NH- 63 in the state of Karnataka under EPC Mode
Project Length: 143.721
Authority: NHAI
Widening of Two/Four Lane with Paved Shoulders of NH-150 Section from End of Yadgir Bypass Km.79+650 (Existing Km 85+880) to Km.118+470 (Existing Km.125+300) to Andhra Border in the State of Karnataka on EPC Mode.
Project Length: 38.82
Authority: NH, Karnataka
Four Laning from Km.4/800 to 24/600 of Nizamabad – Jagdalpur Section of NH-63 on EPC Mode in the State of Telangana.
Project Length: 19.8
Authority: R&B Telangana
Rehabilitation & Upgradation from Km.18+350 to 56+000 of Chittoor-Kurnool Road of NH-18 (New NH- 40) to Two Lane with Paved Shoulder in the State of Andhra Pradesh (under EPC Mode).
Project Length: 37.65
Authority: R&B Andhra Pradesh
Rehabilitation and Upgrading to 2 lanes/2 lane with paved shoulders configuration of Jainagar - Narahiya Section of NH-104 commencing from Km.156.500 to Km.219.945 in the State of Bihar.
Project Length: 63.445
Authority: NHAI
Rehabilitation and up-gradation of Dhindi – Digamarru section from Km 126/510 to Km 135/740 of NH-214 (New NH-216) and Digmarru – Losari section from Km 0/000 to Km 34/230 of NH-214A (New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP –IV Through Engineering, Procurement & Construction (EPC) basis contract for MoRT&H
Project Length: 43.46
Authority: MORT&H
Rehabilitation and up-gradation of Gurajanapalli Village – Polekuru Village section from Km 41/161 to Km 59/800 of NH-214 (New NH-216) and Komargiri – Pasarlapudi section from Km 70/400 to Km 105/170 of NH-214 (New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh for MoRT&H
Project Length: 53.409
Authority: MORT&H
Construction of Permanent Longitudinal Drain for Disposal for Storm Water along NH-8 from Rajiv Chowk to Kherki Daula Toll Plaza for NHAI .
Project Length: 5
Authority: NHAI
Four/Two laning with Paved Shoulder of Mohanur - Namakkal Section of SH-95 from Km.0+000 to Km.13+100 (Package EPC03) in the State of Tamil Nadu for TNRSP.
Project Length: 13.1
Authority: TNRSP
Four Laning of existing Thiruvananthapuram Bypass and continuing the bypass with new alignment further as alternative road for existing NH-47 from Kazhakkootam (Thiruvananthapuram) to Mukkola Junction (Km.0+000 to Km.26.50) under NHDP Phase IIIA in the state of Kerala on EPC Mode for National Highways Authority of India.
Project Length: 26.5
Authority: NHAI
Widening Carriageway to two lane from Km.215/0 to 231/0 and 236/0 to 247/0 of Hyderabad – Bhupalapatnam section of NH-163(Old NH-202) for Roads & Buildings Department, Government of Telangana.
Project Length: 27
Authority: R&B Telangana
Construction of High Level Bridges at Km.69/8-10, 9/8-10 and 98/8-10 of Sirancha – Athmakur Road NH-363 under EPC Mode for Roads & Buildings Department, Government of Telangana.
Project Length: 1
Authority: R&B Telangana