Projects

List of Pre-Tender Engineering Projects

PLR Projects Pvt Ltd

Four laning of Saoner - Dhapewad - Kalmeshwar - Gondkhairi section NH-547E from Km.4.700 to Km.33.575 in the State of Maharashtra on EPC Mode.

Project Length: 28.9

PLR Projects Pvt Ltd

Rehabilitation and Up gradation to two lane with paved shoulders from Km 57/700 to 103/200 (Madakasira to A.P/Karnataka Border/of NH544E).

Project Length: 45.5

Gannon Dunkerley & Co. Ltd., Mumbai.

Upgradation to 4-Lane with Paved Shoulder configuration of Nagpur Umred Section of NH-353D (Package 1A Km.7/300 to Km.54/385) in the State of Maharashtra on EPC Mode

Project Length: 47.1

Gannon Dunkerley & Co. Ltd., Mumbai.

4-Laning of Warora - Wani Section of NH-930 from Km.313.850 to Km.332.160 in the State of Maharashtra on EPC Mode.

Project Length: 18.3

Gannon Dunkerley & Co. Ltd., Mumbai.

2 Laning with Paved Shoulder from Km.30+800 to Km.70+800 and without Paved Shoulder from Km.70+800 to Km.84+120 of NH-4A in the State of Karnataka through EPC Mode.

Project Length: 53.3

Gannon Dunkerley & Co. Ltd., Mumbai.

Construction of Four Laning from Km.624.480 to Km.653.225 (delinked stretch of Seoni-MP/MH Border) of NH-7 in the State of Madhya Pradesh under NHDP Phase - III on EPC Mode

Project Length: 28.7

Inroad Techno Consultants Pvt Ltd.

Improvement of Gagaria-Baori Kalan-Serwa-Bakhasar section of NH-925 and Sata-Gandhav Section of NH 925A in the state of Rajasthan for a total length of 196.70kms on EPC Mode.

Project Length: 196.7

Inroad Techno Consultants Pvt Ltd.

Four laning of Kandi to Ramasanpalle Section of NH-161 from Km.0.000 to Km.39.980 (Design) in the Stage of Telangana on EPC Mode.

Project Length: 40.0

Gannon Dunkerley & Co. Ltd., Mumbai.

Rehabilitation and Upgradation of Jabalpur to Hiran River Section of NH-12 from existing Km.11/400 to Km.66/400 (Design Ch.10.400 to Ch.66.000) in the state of Madhya pradesh to four lanes with paved shoulders.

Project Length: 55.6

Gannon Dunkerley & Co. Ltd., Mumbai.

Rehabilitation and Upgradation of Goharganj to Bhopal Section of NH-12 from existing Km.255/300 to Km.301/200 including construction of Obedullaganj Bypass from existing Km.278/450 of NH-12 to existing Km.3/600 of NH-69 in the state of Madhya pradesh to four lanes with paved shoulders.

Project Length: 29.4

Gannon Dunkerley & Co. Ltd., Mumbai.

Construction of 4-Lane road on NH-12 (New NH-52) from Km.299.000 to Km.346.540 (Design 9.860 to 58.740) (Darah- Jhalawar-Teendhar Section) in the State of Rajsthan under NHDP Phase-III on Hybrid Annuity Mode.

Project Length: 48.9

Gannon Dunkerley & Co. Ltd., Mumbai.

Upgradation of State Highways to 2 Lane with/without Paved Shoulder configuration in the state of Maharashtra under MRIP on Hybrid Annuity for a) Vaijapur-Bheda Phata Section, b) Dahegaon Bangala-Karmad Section c) Paithan-Pachod Section & d) Kaccher - Dharmtrith Section.

Project Length: 148.5

Ashoka Concessions Limited, Nashik.

Construction and Up-gradation of NH-131A from Km.34.578 near Narenpur to Km.81.000 near Purnea (design chainage Km.6.000 to Km.55.000) (Design Length - 49.00 km) to 4-lane standard in the State of Bihar (Package-II) on Annuity Hybrid Mode.

Project Length: 49.0

S V Consultants, Bangalore.

Pre-bid engineering for Four Laning of Dimapur to Kohima Section of NH 39 in the State of Nagaland.

Project Length: 39.0

IL&FS Transportation Networks Limited, Ahmedabad.

Providing Pre-Bid Engineering Services for Traffic and Engineering Surveys for Four laning of Amravati - Chikhli (Package - I) section of NH-6 in the State of Maharashtra.

Project Length: 194.0

IL&FS Transportation Networks Limited, Ahmedabad. 8

Pre-Bid Engineering Services for WCP-7 (Hungund-Muddebihal- Talikot Approx Length of 56.99 kms) under Upgrading and Maintenance of State Highways under Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) on Annuity Basis.

Project Length: 57.0