Construction of 4-Lane divided Highway from Melur to Karaikudi section of NH-38 in Tamil Nadu.
Project Length: 45.86
Authority: NHAI
Rehabilitation and Upgradation to 4-Lane Standard from Talchar to End of Kamakhyanagar Bypass Section of(Km.8+844 - Km.15+725) NH-149 and (Km.301+875 - Km.335.946) of NH-53 in the State of Odisha
Project Length: 40.952
Authority: NHAI
Widening/Strengthening/Up-gradation to Two lane with Paved Shoulder from Km.251+120 to Km.275+000 (Wajwana-Banswara) Section of NH- 927A in the State of Rajasthan.
Project Length: 23.88
Authority: PWD Rajasthan
Six Laning of Aurangabad to Bihar – Jharkhand Border (Chordaha) Section of NH-2 from km 180.000 to km 249.525 (Design Length – 69.786km) in the State of Bihar under NHDP Phase-V
Project Length: 69.786
Authority: NHAI
Six Laning of Bihar – Jharkhand Border (Chordaha) to Barwa Adda section of NH-2 from km 249.525 to km 320.810 (Design Length – 71.285 km) in the State of Jharkhand under NHDP Phase-V
Project Length: 71.285
Authority: NHAI
Four laning of NER CHOWK PANDOH including PANDOH BYPASS section NH-21 (Package-1 Km 190.000 to km 221.305) under NHDP-IVB in the state of Himachal Pradesh on EPC basis including three twin tube tunnels.
Project Length: 31.305
Authority: NHAI
Construction of 17.2km Green Field Four Lane Vizainagaram bypass including two RoBs in the State of Andhra Pradesh.
Project Length: 17.2
Authority: R&B Andhra Pradesh
Rehabilitation & Upgradation to Two Lane with Paved Shoulders from Km.0/000 to Km.72/600 (Nakrekal to Tanamcherla Section) of NH-365 in the State of Telangana.
Project Length: 65.963
Authority: R&B Telangana
Rehabilitation and Up-gradation of Jabalpur-Mandla- Chilpi Section of NH-12A from Km.22/8 to Km.89/6 (Design Length 63.55km) to Two Lane with Paved shoulder as Rigid Pavement Road in the State of M.P on EPC Mode.
Project Length: 63.55
Authority: NHAI
Rehabilitation and up-gradation of Timmapuram - Gurajanapalli section from Km 26+150 to Km 41+161 of NH-214 (New NH-216) to Two Lane with paved shoulder in the state of Andhra Pradesh.
Project Length: 15.011
Authority: MORT&H