Projects

List of Proof Check Consultancy Projects

JSR Infra Developers Pvt Ltd

Construction of 4-Lane divided Highway from Melur to Karaikudi section of NH-38 in Tamil Nadu.

Project Length: 45.86

Authority: NHAI

Kunal Structures (I) Pvt Ltd., Rajkot.

Rehabilitation and Upgradation to 4-Lane Standard from Talchar to End of Kamakhyanagar Bypass Section of(Km.8+844 - Km.15+725) NH-149 and (Km.301+875 - Km.335.946) of NH-53 in the State of Odisha

Project Length: 40.952

Authority: NHAI

K.K.Gupta Constructions Pvt Ltd.

Widening/Strengthening/Up-gradation to Two lane with Paved Shoulder from Km.251+120 to Km.275+000 (Wajwana-Banswara) Section of NH- 927A in the State of Rajasthan.

Project Length: 23.88

Authority: PWD Rajasthan

Reliance Infrastrucure Limited

Six Laning of Aurangabad to Bihar – Jharkhand Border (Chordaha) Section of NH-2 from km 180.000 to km 249.525 (Design Length – 69.786km) in the State of Bihar under NHDP Phase-V

Project Length: 69.786

Authority: NHAI

Reliance Infrastrucure Limited

Six Laning of Bihar – Jharkhand Border (Chordaha) to Barwa Adda section of NH-2 from km 249.525 to km 320.810 (Design Length – 71.285 km) in the State of Jharkhand under NHDP Phase-V

Project Length: 71.285

Authority: NHAI

KMC Constructions

Four laning of NER CHOWK PANDOH including PANDOH BYPASS section NH-21 (Package-1 Km 190.000 to km 221.305) under NHDP-IVB in the state of Himachal Pradesh on EPC basis including three twin tube tunnels.

Project Length: 31.305

Authority: NHAI

SVS Mookambika Constructions Pvt Ltd

Construction of 17.2km Green Field Four Lane Vizainagaram bypass including two RoBs in the State of Andhra Pradesh.

Project Length: 17.2

Authority: R&B Andhra Pradesh

RMN-KMV (JV)

Rehabilitation & Upgradation to Two Lane with Paved Shoulders from Km.0/000 to Km.72/600 (Nakrekal to Tanamcherla Section) of NH-365 in the State of Telangana.

Project Length: 65.963

Authority: R&B Telangana

Gannon Dunkerley & Co. Ltd., Mumbai.

Rehabilitation and Up-gradation of Jabalpur-Mandla- Chilpi Section of NH-12A from Km.22/8 to Km.89/6 (Design Length 63.55km) to Two Lane with Paved shoulder as Rigid Pavement Road in the State of M.P on EPC Mode.

Project Length: 63.55

Authority: NHAI

Kunal Structures (I) Pvt Ltd., Rajkot.

Rehabilitation and up-gradation of Timmapuram - Gurajanapalli section from Km 26+150 to Km 41+161 of NH-214 (New NH-216) to Two Lane with paved shoulder in the state of Andhra Pradesh.

Project Length: 15.011

Authority: MORT&H